Monday, May 18, 2015

Day 1: Drilling the NEW 4" G.I. Pipe

We needed to replace the old G.I. Pipe taken by Mr. Felix Mendoza - the old tenant.

Mr. Midol Sold his G.I. Pipe (old but thick and like NEW)  for P2,000 + Labor to Drill Man to put up a new Water Source for the RiceFiled during

 1.) 3rd croppings - When there is NO irrigation
2.) Manual Jetmatic Pump for everyday water use.

4" G.I. Pipe is already buried after i came.


Left is Mr. Akil Midol
Center is The Drill Man
Right is Mr. Rudy Midol




No comments:

Post a Comment